Send us feedback

Latest news

Iron Ore Bound for China through East Arm

Thursday, 11 July 2013
Darwin Port Corporation today welcomed the commencement of stockpiling operations at East Arm by Sherwin Iron, in preparation for their first export shipment next month.  Acting Chief Executive, Melissa Reiter, said "it was a great turnout for the arrival of the first truck to the new stockpile. » Read more

New Traffic Management Plan

Monday, 08 July 2013
Darwin Port Corporation has introduced a new Traffic Management Plan (TMP).  The objective of this plan is to ensure the safety of all its port users, to maintain clear road rules, minimise disruption to each port user at the DPC workplace, plan for temporary road changes/detours and ensure traffic management operational plans are developed in accordance with workplace demands to minimise traffic congestion.  Many varying types of work are carried out a DPC workplace, ranging from loading and unloading of cargo, livestock, bulk materials utilising high risk plant and » Read more

New Traffic Management Plan

Monday, 08 July 2013
Darwin Port Corporation has introduced a new Traffic Management Plan (TMP).  The objective of this plan is to ensure the safety of all its port users, to maintain clear road rules, minimise disruption to each port user at the DPC workplace, plan for temporary road changes/detours and ensure traffic management operational plans are developed in accordance with workplace demands to minimise traffic congestion.  Many varying types of work are carried out a DPC workplace, ranging from loading and unloading of cargo, livestock, bulk materials utilising high risk plant and » Read more

Darwin Harbour Clean-Up, Friday 12 July 2013

Friday, 05 July 2013
DPC is proud to once again sponsor and provide labour and equipment for the Darwin Harbour Clean-Up 2013. It is expected that more than 100 keen volunteers will be out in the harbour and around the foreshore 12 July 2013 to clean up our harbour by collecting rubbish and items in and around the foreshore. To read the NT Seafood Council's media release, click the link below. » Read more

New Dangerous Goods and Cargoes Policy - July 2013

Friday, 05 July 2013
Darwin Port Corporation has released the Dangerous Goods and Cargoes Policy. The policy sets out the requirements for transporting dangerous goods and cargoes through the Port of Darwin. To view the policy please click link below. For all Dangerous Goods enquiries please email dg.dpc@nt.gov.au. » Read more

2013 NT Gala Seafood Ball & Awards

Tuesday, 25 June 2013
Every two years the Northern Territory Seafood Industry unites to recognise professionalism and commitment by outstanding individuals. The 2013 NT Gala Seafood Ball & Awards are being held at the SkyCity-Lawn Marquee on Saturday 27 July 2013.  Click here for more information. » Read more

Flare Demonstration 28 June 2013

Tuesday, 25 June 2013
Please be informed that a Flare Demonstration will be held at East Point Reserve on Friday 28 June 2013 at 8:30am-10:00am.  Click here for further information. » Read more

National System for Domestic Commercial Vessel Safety (National System) to commence 1 July 2013

Wednesday, 19 June 2013
The Australian Maritime Safety Authority (AMSA) will become the National Regulator for domestic commercial vessels and administrator of the National System from 1 July this year. The commencement date brings to fruition the decision made by Council of Australian Governments (COAG) Ministers in August 2011 to take a national approach to marine safety regulation. The Navigation Act 2012 will also commence on 1 July 2013. » Read more

Heavy Vehicle Movements - EAW to Blaydin Point

Wednesday, 19 June 2013
Please be advised that movements of heavy vehicles carrying piling materials (large pipes and other steel structures) will soon start as part of the construction of the Ichthys Project onshore LNG facilities. Each heavy vehicle movement will involve two trucks carrying long, oversized loads travelling from East Arm Port to Blaydin Point. » Read more

Planned Flaring Activity 11 – 14 June - Darwin LNG Wickham Point

Tuesday, 11 June 2013
Darwin LNG will conduct planned flaring activity between 12 and 14 June 2013 at its Wickham Point facility in Darwin, Northern Territory. Darwin LNG will be receiving anLNG carrier which requires cool down in order to receive LNG for loading. In the industry this is referred to as a ‘hot ship.’ Please be advised that this operation requires additional flaring activity to maintain a safe operating environment. » Read more